A minor step in a concrete slab on grade features a maximum vertical change of four inches accommodated over a two-foot transition length. The reinforcing steel is jogged to maintain continuous cover through the sloped transition zone. The subgrade is prepared beneath both upper and lower slab elevations.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership