An upturned pile cap sits adjacent to an existing concrete mat foundation supporting a slab on grade, separated by a bond breaker. New and existing foundations are supported by augercast piles and existing timber piles where applicable. Existing precast piles are abandoned where they occur below the new construction. The basement mat slab transitions to the parking level at a lower elevation.
245 BASEMENT -0'-5" G H J J.2 PARKING -3'-6" AUGERCAST PILE, WHERE OCCURS (E) TIMBER PILE, WHERE OCCURS (E) PRECAST PILE TO BE ABANDONED, WHERE (E) SOG ON CONC MAT FDN (E) CONC WALL UPTURNED PILE CAP BSMT MAT SLAB (E) 245 MARKET BOND BREAKER BETWEEN (E) AND NEW FOUNDATIONS