This bridge section details the concrete deck termination at an edge beam with polystyrene insulation. Reinforcing includes number four bars at eight inches on center vertically and number four bars at twelve inches horizontally, with continuous number four bars top and bottom hooked at the ends. The steel beam support is positioned per plan with deck support details referenced. Elevation level 3 is established at thirty-seven feet six inches.
201 LEVEL 3 37' - 6" 6" ORIENTATION PER PLAN SOSD ORIENTATION PER PLAN STL BM EL PER PLAN SEE "TYPICAL DECK SUPPORT" DETAILS PER PLAN 4" PER PLAN CL BM POLYSTYRENE TYPE TYP, NOTE 1 #4x @ 12" #4 @ 8" OC Ld Ld #4 CONT T&B HOOK AT ENDS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership