A vertical concrete pier extends upward from a concrete footing, with sizing and reinforcement governed per plan and schedule. A concrete slab on grade intersects the pier at the upper level, bearing on subgrade material.
CONCRETE SLAB ON GRADE, SEE PLAN CONCRETE PIER, SEE PLAN AND SCHED CONCRETE FOOTING, SEE PLAN AND SCHED
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership