A slab-on-grade bears adjacent to a concrete basement wall and is tied into the wall face using number 4 adhesive hooked dowels with a six-inch embedment. The slab connects to a perimeter footing sized per the part plan. A topping slab finishes over the basement wall at Level 1, matching the required spacing.
LEVEL 1 C #4 ADHESIVE HOOKED DOWEL W/ 6" EMBED BASEMENT WALL TOPPING SLAB SLAB-ON-GRADE PER PART PLAN FOOTING PER PART PLAN 6" SPACING TO MATCH SPACING TO MATCH
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership