Timber lagging bears a minimum of two inches on the steel pile flange. A concrete encasement surrounds a portion of the steel pile section. Portions of the concrete encasement are removed as required for the installation of the lagging. Orientation is sized per plan.
TIMBER LAGGING, TYP BEAR LAGGING 2" MIN. ON PILE FLANGE, TYP CONCRETE ENCASEMENT REMOVE CONCRETE AS REQ'D FOR INSTALLATION SEE PLAN FOR ORIENTATION
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership