A non-bearing concrete masonry unit wall bears on a thickened slab-on-grade foundation with two number five continuous bottom reinforcing bars. Vertical dowels matching the wall reinforcement with alternate bends extend from the footing into the masonry cells with a lap splice. The concrete surface is roughened to a quarter-inch amplitude and cleaned prior to masonry installation.
NON-BEARING CMU WALL SEE PLAN AND SCHEDULE (2) #5 CONTINUOUS SLAB ON GRADE SEE PLAN FOR THK AND REINFORCING 1' - 6" 1' - 0" DOWELS TO MATCH VERT WALL REINF ALTERNATE BEND 3" CLR LAP SPLICE ROUGHEN TO 1/4" AMPLITUDE AND CLEAN SURFACE PRIOR TO MASONRY INSTALLATION