An excavation limitation line is established adjacent to foundation elements with a three-inch vertical clearance dimension noted. A leader line points to the allowable cut boundary marked with the explicit restriction stating no excavation below this line is permitted unless specifically authorized by the project soils engineer.
NO EXCAV. BELOW THIS LINE, UNLESS ALLOWED BY PROJECT SOILS ENGINEER 3" 1 1
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership