A structural build-up slab bears on a polystyrene fill layer over a structural slab, positioned adjacent to an existing concrete structure with a two-foot offset dimension. Reinforcement within the build-up slab conforms to the build-up slab on polystyrene schedule, featuring continuous longitudinal and transverse reinforcing bars with hooked ends. The assembly ties into the adjacent concrete structure via dowels extending across the interface joint.
STRUC SLAB REINF PER "BU SLAB ON POLYSTYRENE SCHEDULE" REINF PER "BU SLAB ON POLYSTYRENE SCHEDULE" 2'-0" ADJACENT CONCRETE STRUCTURE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership