Canopy beams connect at a mitered corner using an L4x4x5/16 by nine-inch structural angle and three seven-eighths-inch diameter bolts spaced at three inches. The connection requires nuts positioned on the inside of the canopy frame. A three-sixteenths-inch fillet weld is specified along three sides.
CL BM BEAMS PER PLAN 1/2" MAX 1 3/4" 1 3/4" 45° 3/16 3 SIDES L4x4x5/16x0'-9" NUT FOR BOLTED CONNECTION TO BE INSIDE THE CANOPY FRAME (3) 7/8"Ø BOLTS @ 3" SPACING CL BM BEAMS PER PLAN 1/2" MAX 1 3/4" 1 3/4" 45° 3/16 3 SIDES L4x4x5/16x0'-9" NUT FOR BOLTED CONNECTION TO BE INSIDE THE CANOPY FRAME (3) 7/8"Ø BOLTS @ 3" SPACING
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership