Concrete is poured over metal deck running perpendicular to a wide-flange beam. Headed shear studs are welded through the metal deck into the top flange of the wide-flange beam in the low flutes of the deck. Deck reinforcement is placed within the concrete slab above the deck according to the project schedule. The wide-flange beam size and concrete fill are sized per the structural plans.
HEADED SHEAR STUDS IN DECK LOW FLUTES DECK REINF. REF. SCHEDULE WF BEAM REF. PLAN CONCRETE OVER METAL DECK REF. PLAN DECK PERPENDICULAR