A non-bearing concrete masonry unit wall abuts a concrete column or wall as located per plan, maintaining a one-inch gap between the two structural elements. A fire-rated caulking joint seals the gap between the concrete surface and the masonry end unit as required by architectural specifications.
1" GAP CONC COL OR WALL PER PLAN FIRE CAULK JOINT AS REQD PER ARCH CMU WALL (NON-BEARING) WHERE OCCURS PER PLAN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership