Demolition of the existing 45 Beale mat slab and excavation as required for new construction. Removal of the existing topping slab where it occurs.
DEMO (E) 45 BEALE MAT SLAB & EXCAVATE AS REQD FOR NEW CONSTRUCTION DEMO (E) 45 BEALE TOPPING SLAB, WHERE OCCURS
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership