A concrete slab T-joint connection features continuous vertical and horizontal joint intersections with a number four reinforcing bar placed with one inch of clearance from the top of the slab. Additional vertical reinforcement is detailed with one inch clearance from the face, dimensioned at one foot six inches above and below the joint intersection.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership