Column blockouts are used when the slab on grade is poured before the erection of the columns. The detail shows the edge of the slab meeting the pile cap with designated top of slab and top of pile cap elevations. Reinforcing steel dowels extend through the slab and pile cap zone around the column blockout location.
ELEVATION D NOTES: 1. COLUMN BLOCKOUTS SHALL BE USED WHEN SLAB ON GRADE IS POURED BEFORE ERECTION OF COLUMNS. BLOCKOUT TOP OF SLAB TOP OF PILECAP, SEE PLAN EDGE OF SLAB NOTE: FOR ADDITIONAL INFORMATION NOT SHOWN SEE A/- & C/- COLUMN, SEE PLAN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership