A concrete ramp slab transitions at Level B2, featuring bottom reinforcement with standard hooks and additional number six bars at eighteen inches on center each way. Dowels matching the slab reinforcement are embedded eight inches into the basement wall using epoxy. A W18 structural steel member supports the ramp transition with a three-quarter-inch base plate secured by four three-quarter-inch diameter anchor bolts.
LEVEL B2 -26'-0" 5" 5' - 0" SLOPE TRANSITION, S.A.D. S.A.D. S.A.D. BOTTOM OF RAMP, S.A.D. ADD'L #6 @ 18" O.C. E.W. BOTTOM REINF. W/ STD. HOOK #4 @ 12" O.C. W/ 135° HOOKS #4 @ 12" O.C. W/ 135° HOOKS BASEMENT WALL RAMP SLAB DOWEL TO MATCH SLAB REINF. EMBED 8" INTO BASEMENT WALL W/ EPOXY FREESTANDING RAMP WALL A SECTION 9" 6" 3" BASE ¯3/4 w/ (4) 3/4"Ø ANCHORS ¯1/2 W18