The concrete placement boom footing ties into the main mat foundation. A tower crane blockout is provided at the contractor's option with formsavers for the future tie-in. Number 4 epoxy-coated reinforcing dowels are drilled and epoxy-grouted at twenty-four inches on center with a six-inch embedment each way. The blockout area is filled with concrete after the placing boom has been removed, maintaining a typical one-inch concrete cover.
NOTES: 1. SEE FOR ADDITIONAL INFORMATION. 7/S4.12 RAT SLAB PER CONTRACTOR CONCRETE PLACING BOOM FOOTING, PLACED PRIOR TO MAT FOUNDATION TOWER CRANE BLOCKOUT AT CONTRACTOR'S OPTION, PROVIDE FORMSAVERS AT LOCATION OF FUTURE TIE-IN DRILL AND EPOXY #4 @ 24" OC W/ 6" EMBED EW, FILL WITH CONCRETE AFTER PLACING BOOM HAS BEEN REMOVED 1" COVER, TYP