Precast concrete wall panels bear upon a concrete erection pad sized per the schedule, with three number five reinforcing bars minimum at the panel base. A vertical three-quarter-inch preformed joint separates the adjacent wall panels. The stepped concrete foundation features bottom reinforcement with a three-inch clearance. Panel thickness dimensions and footing sizes are referenced from the engineering schedule.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership