Metal deck bears alongside an upturned wide flange steel beam and is secured with powder-actuated fasteners at six inches on center. A joist connects to the beam using a top flange hanger installed per the manufacturer's typical specifications.
T/DECK PER PLAN JOIST PER PLAN BEAM PER PLAN TOP FLANGE HANGER PER PLAN, TYP PER HGR MFR METAL DECK PER PLAN PAF @ 6"OC METAL DECK TO STEEL BEAM
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership