The assembly features a concrete slab over a profiled metal deck with continuous 10M reinforcing steel bars and epoxied 10M dowels spaced at 600 millimeters on center with a 100-millimeter embedment. The top surface incorporates a high-performance traffic coating and single-pour curb integration. The drawing provides clear references to deck schedules, curb plans, and slope requirements.
Text on the drawing
PK - SECOND LEVEL 106.80 FOR SLOPES, SEE CURB PLANS HIP PERFORMANCE TRAFFIC COATING SEE DECK SCHEDULE ON S-PK-0.05 FOR REINF SEE CURB PLANS S-PK-1.10 & 1.11 SINGLE POUR 10M DOWELS AT 600 O/C , EPOXIED 100 EMBED CONT 10M