A concrete placing boom footing is cast prior to the main mat foundation, featuring a blockout for future equipment removal. Number 4 epoxy-grouted dowels are drilled at twenty-four inches on center with a six-inch embedment each way around the blockout perimeter. Mechanical couplers or formsavers are provided at the contractor's option for future slab tie-ins. The blockout void is filled with concrete after the placing boom has been removed.
RAT SLAB PER CONTRACTOR NOTES: 1. SEE AND FOR ADDITIONAL INFORMATION. CONCRETE PLACING BOOM FOOTING, PLACED PRIOR TO MAT FOUNDATION CONCRETE PLACING BOOM BLOCKOUT AT CONTRACTOR'S OPTION, PROVIDE FORMSAVERS AT LOCATION OF FUTURE TIE-IN DRILL AND EPOXY #4 @ 24" OC W/ 6" EMBED EW, FILL WITH CONCRETE AFTER PLACING BOOM HAS BEEN REMOVED 15/S4.11 16/S4.11 1" COVER, TYP