A concrete floor slab at Level 01 bears against a concrete foundation wall with a stepped transition. The vertical reinforcing dowel extends through the foundation and slab elements along a central axis. The top of the slab is established at the 0'-0" elevation datum.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership