A structural steel column is positioned adjacent to a concrete tilt-up panel and a concrete slab on grade. A block-out in the slab is designated to be poured solid after the column is installed. Exterior slab or grade is detailed per architectural drawings. Non-shrink material is specified beneath the slab.
CONC TILT-UP PANEL, SEE PLAN AND ELEVATIONS EXTERIOR SLAB OR GRADE, SEE ARCH BLOCK-OUT IN SLAB. POUR SOLID AFTER COL IS INSTALLED 1 1/2" NON-SHRINK CONC SLAB ON GRADE, SEE PLAN STEEL COL, SEE SCHEDULE 1" 5/16 A <7 A 21. A T 7 lli -T=I / A 1 ____ BIBIBIBIB 1 — A A <1 sat =111=111=1" 1=111=’ 1