An existing concrete shear wall features a new opening infill tied into the surrounding structure with number six epoxy dowels at twelve inches on center on all four sides. The assembly incorporates nine-inch infill at existing concrete shear wall openings along grid line twenty-four point two. Existing concrete-encased steel columns are integrated into the wall construction with typical concrete shear wall overlays.
M N 24.2 9" INFILL (E) SW OPNG 141" NEW OPNG IN (E) CONC SW (E) CONC SW, TYP (E) CONC-ENCLOSED STL COL, TYP CONC SW OVERLAY, TYP #6 x 3'-0" EPOXY DWLS AT 12" (4) SIDES OF (E) OPNG
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership