The detail illustrates the intersection of a reinforced concrete grade beam foundation and a concrete floor slab. It specifies rebar development lengths (Ld), pour breaks, and references to structural plans and schedules for slab and grade beam reinforcement.
Text on the drawing
T.O MAIN FLOOR 100.00 150 90 POUR BREAK, SEE NOTE 4 FOR SLAB REINF SEE PLAN FOR GRADE BEAM REINF SEE SCHEDULE FOR SLAB REINF SEE PLAN Ld Ld
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe