Concrete core wall vertical reinforcement extends into a forty-two inch thick mat foundation via dowels sized and spaced to match the shear wall vertical reinforcement. All wall tie reinforcement, including hoops and crossties, extends a minimum of twelve inches into the top of the mat foundation and throughout any pits in the mat. Hook dowels or headed bars are provided at the contractor's option.
42" CORE WALL MAT EXTEND ALL WALL TIE REINF(HOOPS & CROSSTIES) A MIN OF 12" INTO TOP OF MAT FDN, AND THROUGHOUT ANY PITS IN MAT DOWEL SIZE & SPACING TO MATCH SHEAR WALL VERTICAL REINFORCEMENT HOOK DOWELS OR HEADED BARS AT CONTRCTOR'S OPTION 13 TYPICAL SHEAR WALL DOWEL