A drilled shaft foundation cross-section features continuous vertical reinforcement and an outer tie cage. Added reinforcement is placed at every other vertical bar. A standard 3-inch clear cover is maintained to the outer tie. Grid mat reinforcement runs through the section.
TO TIE 3" CLR OUTER TIE, SEE NOTE 9 CONT VERT REINF, PLACE ADDED REINF EVERY OTHER BAR MAT REINF, TYP TYPICAL
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership