A concrete floor slab bears directly on a vertical concrete support column. The top of the slab aligns with the Level 01 datum at zero feet and zero inches. Grid line A.6 intersects the connection vertically.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership