A concrete mat foundation section displays four distinct top reinforcing layers labeled T1 through T4, with T1 designated as top upper and T2 as top lower, along with four bottom reinforcing layers labeled B1 through B4, with B1 designated as bottom lower and B2 as bottom upper. A standard three-inch concrete clearance is maintained at the bottom face of the mat foundation. Mat thickness and reinforcing sizes are sized per plan. Orientation of the top and bottom reinforcing layers follows specific plan notes.
TYPICAL MAT REINFORCING, SEE PLAN SEE PLAN MAT THICKNESS TOP OF MAT FDN SEE PLAN CLR 3" T2 LAYER (TOP LOWER) T1 LAYER (TOP UPPER) B2 LAYER (BOTTOM UPPER) B1 LAYER (BOTTOM LOWER) NOTE: SEE PLAN NOTES FOR ORIENTATION OF TOP UPPER/LOWER AND BOTTOM UPPER/ LOWER LAYERS T3 LAYER T4 LAYER B3 LAYER B4 LAYER