A structural steel beam supports a metal roof or floor deck running parallel to the framing members. Steel joists are placed where required per plan alongside the main beam. The metal deck fastens directly to the top flange of the steel beam according to the project deck fastening schedule.
STEEL JOIST WHERE OCCURS, PER PLAN STEEL BEAM, PER PLAN METAL ROOF OR FLOOR DECK, PER PLAN METAL DECK CONN PER DECK FASTENING SCHEDULE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership