The assembly features a vertical cold-formed metal stud connected to an elevated floor edge via a rigid clip assembly for hung spandrel framing. The floor consists of a concrete-filled metal decking supported by a structural steel beam, which is further stabilized by structural bracing as required. Fasteners secure the clip assembly to the beam flange near the slab edge.
Text on the drawing
EQ. EQ. EDGE OF SLAB VERIFY PER ARCH BEAM PER PLAN METAL STUD RIGID CLIP ASSEMBLY FOR HUNG SPANDREL FRAMING FASTENERS AS REQ'D CONCRETE FILLED METAL DECKING BRACING AS REQ'D
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe