The construction joint details a concrete slab-on-grade divided with dowels placed horizontally at the center of the slab per the foundation plan schedule, finished with one-eighth-inch tolled edges at the joint interface. The control joint features a sawcut with a maximum width of zero point one inches and a depth of T over five plus or minus one-quarter inch.
CONSTRUCTION JOINT CONTROL JOINT T/5 ± 1/4" 0.1" SAWCUT MAX DOWEL PER SCHEDULE IN DETAIL 4/- DOWELS TO BE HORIZONTAL AT CENTER OF SLAB 1/8" TOLLED EDGES T T CONCRETE SLAB SEE FOUNDATION PLAN CONCRETE SLAB SEE FOUNDATION PLAN