Beam web penetrations require a minimum distance equal to the depth of the penetration from any support or point load, and two times the penetration diameter to the next penetration. Sizing for the opening width follows the referenced structural schedule.
OR POINT LOAD ≥ "d" TO SUPPORT REF. SCHEDULE "W" 2x "d" MIN. TO NEXT PROVIDE (2) PENETRATION 1" = 1'-0" 4 BEAM PENETRATION - SCHEDULE
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership