Concrete fill over metal deck bears on a structural steel beam sized per plan. Welds are applied per schedule and detailed elsewhere, maintaining a two inch minimum typical spacing. Deck direction is indicated per plan on either side of the transition centerline.
STL BM PER PLAN CONC FILL OVER METAL DECK PER PLAN DECK DIRECTION PER PLAN DECK DIRECTION PER PLAN WELDS PER SCHED SEE DETAIL TYP 2" MIN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership