The detail illustrates a continuous metal track and metal studs aligned with the edge of a concrete-filled metal decking supported by a steel beam. A rigid clip assembly for hung spandrel framing connects the metal stud to the structural floor edge, supplemented by necessary fasteners and bracing as required by structural engineering plans.
Text on the drawing
EQ. EQ. EDGE OF SLAB VERIFY PER ARCH BEAM PER PLAN METAL STUD CONT TRACK W/ SMS EA. SIDE AT EA. STUD RIGID CLIP ASSEMBLY FOR HUNG SPANDREL FRAMING FASTENERS AS REQ'D CONCRETE FILLED METAL DECKING BRACING AS REQ'D
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe