A stepped floor slab transition over a metal deck with concrete fill. The assembly features a WT fill beam and structural beams sized per plan, supporting a metal deck and concrete fill system. A fourteen gauge Z-closure is incorporated at the vertical step junction. Reinforcement includes continuous number four bars at the top and bottom of the step, supplemented by number four bars spaced at twelve inches on center.
BEAM SEE PLAN TOP OF FLOOR SLAB, SEE PLAN 14 GA Z-CLOSURE #4@12" #4 CONT T&B OF STEP WT FILL BEAM SEE PLAN FOR SIZE SEE SCHED METAL DECK & CONC FILL PLAN SEE 6" SEE SCHED METAL DECK & CONC FILL
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership