Post-tensioned concrete slab construction features grouped tendons passing through a concrete column location per plan and schedule. Distributed tendons run beyond the column zone with added reinforcement placed as specified on the plan. Transverse added reinforcement is omitted from the view for clarity. The concrete slab interface at the column exhibits a roughened surface.
CONC COL PER PLAN AND SCHED ADDED REINF PER PLAN, TRANSVERSE ADDED REINF NOT SHOWN FOR CLARITY DISTRIBUTED TENDONS BEYOND CONC COL (WHERE OCCURS) ROUGHENED SURFACE CONC SLAB GROUPED TENDONS SEE NOTE 2
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership