A concrete ramp slab is reinforced with number three bars spaced at eighteen inches on center each way, matching the truck court slab thickness unless noted otherwise. The joint is formed with a depth of T over four and a minimum one and one-quarter inches. The concrete slab rests on a twelve-inch layer compacted to ninety-five percent compaction over compacted fill specified by the geotechnical report.
CONTROL JOINT AT RAMP SLAB 1 CAUTION : IF THIS SHEET IS NOT A 30" X 42" IT IS A REDUCED PRINT
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership