This concrete construction joint details the connection between adjacent slab or wall pours with a thickness designated as T. A formed keyway is created using a two-by block that is tapered, oiled, one foot long, and spaced at twenty-four inches on center, while the joint interface requires sandblasting. Continuous dowels span the joint per the provided schedule, and reinforcing steel features lap splices sized according to the schedule.
4" MAX T/3 1 1/2" T THICKNESS LAP PER SCHED. KEY FORMED W/ 2x BLOCK TAPERED AND OILED 1'-0" LONG @ 24" O.C. SANDBLAST JOINT DOWEL PER SCHEDULE DOWEL SCHEDULE