A new concrete slab bears over an existing concrete pile cap with an intervening layer of compressible filler placed directly above the pile cap. A bond breaker consisting of polystyrene is installed beneath the slab. An additional bond breaker is detailed between the existing pile cap and the new mat slab.
COMPRESSIBLE FILLER ABOVE (E) PILE CAP BU SLAB ON POLYSTYRENE BOND BREAKER BTWN (E) PILE CAP NEW MAT SLAB
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership