The detail shows a steel structural column connecting to a base plate and anchor assembly anchored into a concrete foundation. Anchor bolts extend downward from the top base plate to a bottom plate embedded within the concrete pile cap, demonstrating minimum embedment depth and clearance requirements.
Text on the drawing
PILE CAP DEPTH TYP 300 COLUMN, SEE PLAN BP AND ANCHORS SEE PLAN BOT PL, SEE BASE PL SCHEDULE 75 MIN SEE BP SCHEDULE MIN EMBED LENGTH
Members view this detail in full resolution, download the CAD files (SVG, PDF), and open any detail in the built-in CAD editor to edit and export DXF or DWG.
Sign in to subscribe