A new basement mat slab and concrete wall bear against an existing concrete pile cap. A bond breaker is installed between the existing pile cap and the new mat slab and concrete wall. The top of the concrete wall matches the adjacent existing concrete elevation. The basement mat slab is set at minus three feet six inches, while the basement level is established at zero feet five inches.
PARKING -3'-6" BSMT MAT SLAB 215 BASEMENT 0'-5" (E) CONC SLAB OVER (E) PILE CAP CONC WALL TO MATCH ADJ TOP OF (E) CONC BOND BREAKER BTWN (E) PILE CAP AND NEW MAT SLAB AND CONC WALL
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership