A stepped transition in a concrete mat foundation features a one-to-one slope. Mat reinforcement is sized per plan with two-inch clearance at the top and three-inch clearance at the bottom. Top of concrete elevation is referenced to the plan. An underground drain is located adjacent to the footing as specified by civil drawings.
Text on the drawing
GRID 0'-3" CLR 0'-3" CLR 0'-2" CLR MAT REINF RE: PLAN 1 1 RE: PLAN TOC RE: PLAN MAT REINF RE: PLAN RE: PLAN UNDERGROUND DRAIN RE: CIVIL