Post-tensioned concrete slab detailing showing evenly spaced tendon bundles with a minimum three-inch clearance. Reinforcing bars are placed per the structural schedule alongside a designated post-tensioning free zone sized per plan. A three-quarter-inch by six-inch chamfer strip is located at the perimeter typical.
T/SLAB SPACE TENDON BUNDLES EQUALLY 3" CLR, MIN PER SCHED B PER SCHED D REINF PER SCHED PT FREE ZONE PER PLAN 3/4"x6" CHAMFER STRIP @ PERIMETER, TYP 1"
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership