A structural concrete slab is cast over an expanded polystyrene fill resting on a base structural slab. Reinforcement for the slab is provided per the designated slab on polystyrene schedule. The edge of the slab maintains a two-foot clearance dimension from the adjacent concrete structure. Dowel or tie reinforcement extends horizontally toward the adjacent structure.
STRUC SLAB REINF PER "BU SLAB ON POLYSTYRENE SCHEDULE" REINF PER "BU SLAB ON POLYSTYRENE SCHEDULE" 2' - 0" ADJACENT CONCRETE STRUCTURE STRUC SLAB REINF PER "BU SLAB ON POLYSTYRENE SCHEDULE" REINF PER "BU SLAB ON POLYSTYRENE SCHEDULE" 2' - 0" ADJACENT CONCRETE STRUCTURE