A gym canopy framing assembly connects to a primary support column. A hollow structural section beam frames into the column via a welded beam-to-column connection sized per plan. The outer edge features an HSS18X fascia member welded to a three-quarter-inch thick cap plate with a complete joint penetration weld. Intermediate HSS6X and HSS12X framing members tie into the assembly with specific connection details referenced to other sheets. A closure plate seals the edge condition typical of the canopy perimeter.
GL HSS TO CAP PL, CJP HSS18X PER PLAN CLOSURE PLATE PER 03 2-S6.13 TYP HSS TO HSS CONNECTION PER 03 2-S6.15 HSS6X PER PLAN HSS6X PER PLAN HSS12X PER PLAN 3/4" THK CAP PL COLUMN PER PLAN HSS BEAM TO COLUMN CONNECTION PER PLAN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership