A concrete slab-on-grade rests on a prepared subgrade sized per the soils report. The slab features typical reinforcement sized per plan and includes a sawcut equal to one-third of the slab thickness performed within twelve hours of the concrete pour. A centerline alignment for the working point joint is indicated directly above the sawcut.
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership