An offset structural steel connection between an HSS post and an HSS beam supporting a steel beam per plan, utilizing threaded rods at spacing per manufacturer requirements for partition assembly attachment. A one-quarter inch fillet weld is applied near side and far side typical. An offset is provided as required per plan between the centerlines of the HSS post and HSS beam.
THREADED RODS AT SPACING PER MFGR PARTITION ASSEMBLY AND ATTACHMENT TO HSS PER MFGR HSS PER ELEVATION BM PER PLAN HSS POST 1/4 NS/FS TYP 1/2" TYP CL HSS BEAM CL HSS POST OFFSET AS REQUIRED PER PLAN SEE FOR ADD'L INFORMATION 9/S5.503 CL BM