A concrete grade beam and slab intersection ties into a reinforced retaining wall. The retaining wall features vertical and horizontal reinforcing bars along with dowels tied into the foundation per the structural schedule. A framed wood beam sits atop the wall secured with a Simpson clip angle, complete with two-by wood blocking and slope-to-drain provisions. Slabs include specified rebar with development lengths, resting over compacted sub-base material.
SLOPE TO DRAIN, S.A.D. LVL BM PER PLAN 2x BLOCKING RETAINING WALL REBAR PER SCHEDULE SIMPSON CLIP ANGLE PER SHEAR WALL SCHEDULE 6" NOTE: PIER REINF NOT SHOWN FOR CLARITY, SEE 3/- #5 VERT BAR @12" o.c. #5 HORIZ BAR @12" o.c. #5 DOWEL @12" o.c. #6 VERT BAR @12" o.c. GRADE BEAM BEYOND SLAB REINF PER PLAN SLAB REINF PER PLAN SLAB REINF PER PLAN SLAB REINF PER PLAN Ld Ld