A framing condition at a slope transition is supported by wide-flange beams. The metal deck breaks and bends as required to accommodate headed stud placement over the framing. A bolted shear connection joins the structural members at the grid line. The bottom of the deck is set to elevations referenced in the plan.
GRID REF. PLAN RAMP BREAK REF. PLAN BOT. OF DECK EL. REF. PLAN WF BEAM REF. PLAN TYP. BREAK AND BEND DECK AS REQ'D. FOR HEADED STUD PLACEMENT WF BEAM REF. PLAN
Members view this detail in full resolution, download the CAD files (SVG, PDF), and can adapt it in the built-in CAD editor — export DXF, DWG, or PDF.
Start membership